Thursday, July 31, 2008

E-Day + 72

We're suffering from extension fatigue today. At this stage, I'm just longing to have a finished house to ourselves and Willow, no dust, no builders, no cleaning everything every night, and no re-setting of my alarm clock every day. Actually, I'm telling a lie - there was no power cut today.
It's getting there - Stephen make excellent progress on the decking, and Alan the kitchen fitter was over putting the back panel and splashback, but unfortunately, not the hood, as he said it was too high and we would have to cut the top panel. After a fraught call with Ernest, it turns out that Alan can do a neat job for us after all, so we'll have to call him to get it sorted. There is an adjustment to be made to the granite, as the back panel shows that the largest granite slab is not 100% level with the smaller one. It's only a millimeter or two, but it shows. Mark should be over tomorrow and hopefully will be able to solve it.

Never a dull day (apart from the weather!)

No comments:

Post a Comment